How is the Storage Boiler charged, and what does it charge from?
The Storage Boiler charges from grid electricity, from on-site renewables such as solar connected by private wire, or from a combination of the two. Standard electrical heating elements embedded in the storage blocks heat the core directly, with no intermediate heat transfer fluid.
Each Heat Cell charges at up to 2 MWe at 690 V, or 1.3 MWe at 400 V. A full charge takes about 2.5 hours at the maximum rate. Charging can be varied continuously from 0 to 100% and switches in under a second, so the system can follow a time-of-use tariff, absorb surplus generation from your own solar or wind, or respond rapidly to a grid balancing instruction.
The controls only charge within the available headroom of your grid connection, so many sites can start within their existing connection. If your network operator requires a guaranteed cap on the power your site imports, Caldera can fit a separate hardware limiter that enforces the cap regardless of what the control software is doing.